MOSSFIELD COMMUNITY STUDIO


PROJECT STATUS / MAY 2026
Neighbourhood walking guide

2026-05-18 to 2026-05-29 / Luca Ferri

UPDATE-2605-0264 / Issued 2026-05-29


 NEEDS ATTENTION

The text draft covers all twelve stops. One access check needs a second visit after temporary roadworks
finish.


Progress measures

 Measure                                      Previous             Current              Target

 Stops drafted                                 7                  12                 12

 Access checks completed                       5 / 12               11 / 12              12 / 12

 Map spreads reviewed                         0 / 3                2 / 3                3 / 3

Completed

- Completed the first full route description.
- Checked the walking time with two volunteer readers.
- Removed one crossing with poor visibility.

Open issues

- Temporary roadworks prevent checking the north-side pavement.

Next steps

 Task                                                           Owner                   Due

 Resolve the open issue and record the agreed next action.                        Luca Ferri                    2026-06-03

 Review the draft with residents and record their comments.                            Sofia Marino                  2026-06-05